OWN-STAY CONDO RENOVATION

Condo Renovation in KL & Selangor

Plan the kitchen, storage and everyday spaces before you move in.

MINA HOME plans and coordinates own-stay condo renovations across KL & Selangor. Kitchen cabinets, wardrobes, plaster ceilings, electrical works and finishing can be planned together within your agreed scope.

See Real Completed Spaces

Start with a WhatsApp message. Your condo name and floor plan can follow later.

Plan your condo renovation budget
Completed condo kitchen with white and timber cabinetry, refrigerator and washing appliance

See how real condo spaces are planned

From kitchens and appliance storage to bedroom wardrobes and built-ins, these completed spaces show different ways to make a condo work harder for everyday living.

Photos show different completed condo spaces and are not presented as one single home.

Full-height glass-door display and storage cabinetry beside a dining or work table

Storage that becomes part of the room

Full-height glass-door cabinetry adds display and storage while keeping the dining or work area usable.

Completed condo kitchen with a large light worktop or island and timber-look cabinetry

More working space in a compact kitchen

A larger counter or island can add preparation space when the surrounding walkway and kitchen layout are planned together.

Compact completed bedroom with full-height wardrobe and integrated window-side platform storage

Use the bedroom height, not just the floor area

Full-height wardrobes and integrated storage help a compact bedroom carry more without adding loose furniture everywhere.

Compact completed kitchen with timber-look cabinetry, sink, hood and tall appliance niche
Timber-look built-in cabinetry arranged around a compact kitchen work zone.
Completed condo kitchen wall with full-height storage, washing appliance and refrigerator
Full-height storage and appliances planned together along the kitchen wall.

What should your condo quotation cover?

Use this checklist to agree what is included, excluded or optional. These are items to discuss, not a fixed package or a promise that every item is included.

Kitchen cabinets and built-in storage
Separate kitchen base units, wall units, wardrobes and other selected built-ins. Confirm widths, heights, finishes, hardware and countertop specifications.
Ceiling, wiring and lighting
Confirm the actual ceiling work area rather than assuming it equals the unit floor area. List existing and new points, and separate fitting supply from installation.
Painting and flooring
Identify the rooms and surfaces to be finished, preparation work and any flooring changes. Check whether skirting, protection and making good are included.
Site arrangements and exclusions
Clarify protection, disposal, access and the sequence of trades. Check current Management requirements separately and record optional work outside the main total.

What should you decide after getting the keys?

You do not need every design decision on day one, but a few early choices make the quotation and renovation planning much clearer.

01

How you will use the floor plan

Start with daily routines: where you cook, eat, work, store things and move through the home.

02

Which appliances must fit

Fridge, washer, dryer, hood, hob and other major appliances can affect cabinet sizes, service points and clearances.

03

Where storage is most important

Decide what needs to live in the kitchen, bedrooms, entry and common areas before filling every wall with cabinetry.

04

What Management requires

Check the renovation application, working hours, lift arrangements, contractor requirements and deposits for your development.

Make the kitchen and built-ins work together

A condo can feel much easier to live in when cabinetry, appliances and circulation are planned as one system instead of separate purchases.

Explore Kitchen Renovation
  • Confirm major appliance dimensions before finalising the cabinet layout.
  • Use full-height storage where it solves a real storage need.
  • Keep enough usable movement around counters, islands and doorways.
  • Coordinate wardrobes, platform storage and other built-ins with the room layout before fabrication.

Plan around your condo Management rules

Every development can have different renovation requirements. Before work starts, confirm the latest rules with your Management / JMB / MC, including the application process, working hours, contractor registration, lift booking or protection, deposits and access arrangements.

Requirements vary by development, so the latest Management guideline for your unit should take priority.

What to send before discussing a quotation

No floor plan yet? You can still contact us. These details help when available; final pricing needs confirmed measurements, specifications and site conditions.

  • Condo / development name
  • Floor plan, when available
  • Whether you have collected the keys
  • Rooms or items you want to renovate
  • Major appliance sizes, if already selected
  • Storage priorities and reference images

Want to see a complete condo renovation case?

Explore our One Equine Residence project in Seri Kembangan, including its kitchen, built-in storage and completed spaces.

View One Equine Residence

Condo renovation questions homeowners ask

What is included in a condo renovation package in Malaysia?

A condo renovation scope can include kitchen cabinets, built-in wardrobes, plaster ceilings, lighting and wiring, painting and curtains when requested. What makes sense depends on the floor plan and the fittings the developer already supplied. A final quotation needs confirmed measurements, materials and an agreed scope.

Do I need Management approval before renovation starts?

Most condominiums have a renovation application process. Check the latest requirements from your Management / JMB / MC before work starts, including deposits, working hours, contractor registration and lift arrangements.

Should I wait until I get the keys before planning?

You can start discussing the floor plan, priorities and reference ideas earlier, but final measurements and site-dependent decisions should be confirmed after access to the actual unit.

Can the kitchen, wardrobes and other built-ins be planned together?

Yes. Planning them together makes it easier to coordinate appliance sizes, storage needs, room clearances and the wider renovation sequence.

What should I prepare for a quotation discussion?

Start by telling us what you would like to renovate. Your condo name, floor plan and appliance details can follow later. A firm quotation still needs the actual dimensions, specifications and agreed scope.

Can a smaller condo still have useful storage?

Yes. The goal is not to fill every wall with cabinets, but to use the available height and built-in opportunities where they genuinely improve daily storage and movement.

How long will a condo renovation take?

The timeline depends on the agreed scope, Management requirements, material decisions, site conditions and the sequence of different trades. It should be confirmed against the actual project rather than assumed from a generic duration.

Planning to renovate your new condo?

Start a WhatsApp conversation about your new home. You do not need a floor plan or a complete list of requirements to get in touch; we can work through the details with you.

Serving homeowners in Kuala Lumpur and Selangor.