Just Collected Your Keys? Your 7-Step Renovation Plan
A practical guide for new condo owners in KL and Selangor—from your first unit check to the final handover.

REAL COMPLETED HOME
What should I do first after collecting condo keys?
Start by photographing the unit and recording visible defects. Then confirm your condo management rules, plan appliances, storage and lighting together, agree on the work sequence, and inspect the completed home before handover.
YOUR RENOVATION ROADMAP
7 Steps From Key Collection to Handover
From your first unit check to move-in, make the right decisions in the right order.
This is a planning guide, not a fixed construction sequence or legal requirement.
STEPS 01 — 02
Keys & Initial Checks
Understand the home you have before planning the home you want.
KEYS: Initial Preparation
The first step is gathering the information you need to plan:
- Secure access and keys
- Review handover documents
- Obtain available floor plans
More key-collection checks
- Assess actual unit condition
- Gather management information
CHECK: Recording Unit Condition
Yes. Before renovation covers original surfaces, record the unit condition. Possible areas to check include:
- Walls, ceiling, and cracks
- Tiles and flooring
- Doors and windows
- Drainage and wet areas
- Sanitary fittings
- Visible electrical points
Note: MINA HOME is a renovation company, not a certified defect inspector, building surveyor, or professional inspection company. This content provides renovation-planning context only.
Homeowner Note on the Defect Liability Period (DLP)
For homes governed by the standard Malaysian Schedule G / H SPA framework, the defect liability framework commonly provides a 24-month period after vacant possession. Developer rectification processes under the standard framework may also carry specific timelines after written notification.
Your actual rights, dates and process depend on your SPA and applicable law. General information only. Not legal advice.
Reference: Malaysian Bar on the DLP ↗
STEP 03
PLAN: Coordinating Your Home
Plan kitchen workflow, storage, appliances, wiring, lighting, ceiling, flooring and built-ins as one coordinated system before confirming final carpentry sizes.
MINA HOME Principle: Do not plan built-ins, appliances and related M&E independently.
- Oven and fridge dimensions affect kitchen cabinetry design.
- TV console planning affects relevant electrical sockets.
- Wardrobe position may affect nearby lighting points and circulation.
- Ceiling planning affects the lighting arrangement.
What about flooring and carpentry?
Flooring and carpentry sequencing should be coordinated based on the specific scope.
STEPS 04 — 05
APPROVE: Management Rules
Condo renovation works generally need management approval before starting. Check your development’s application process, deposits and site rules, which may include:
- Renovation application and drawings
- Renovation deposit
- Worker registration
- Working hours restrictions
- Service lift usage
- Site protection
- Debris disposal rules
Every development can have different renovation requirements. Always check the latest rules from your own management office before work starts.
COORDINATE: The Sequence of Works
Use this as a planning example, then adjust the sequence to your actual site and scope.
- 01Site condition & preparation
- 02Required M&E & plumbing
- 03Wet works (where applicable)
- 04Ceiling & flooring coordination
- 05Final site measurements
- 06Carpentry & built-ins
- 07Finishing & painting
- 08Testing & touch-up
The actual sequence varies by project scope and site condition.
STEPS 06 — 07
Build & Handover
BUILD: Homeowner Control
During the build phase, practical homeowner control involves:
- Documenting all decisions
- Confirming scope changes formally
- Verifying site measurements
See the full checklist
- Confirming approved carpentry drawings
- Confirming important appliance requirements
- Keeping progress communication clear
HANDOVER: Final Review
The final review areas typically include:
- Outstanding works
- Cabinet doors and drawers alignment
- Lighting and sockets (where applicable)
See the full checklist
- Plumbing and sanitary items (where applicable)
- Touch-ups
- Cleaning
- Handover record
FROM DESIGN TO REAL SPACE
Planning Becomes Reality
See how the 3D design direction relates to a real completed MINA HOME home.


AVOIDABLE MISTAKES
Common Mistakes Before Renovation
- Ordering built-ins before final site measurements
- Ignoring management rules and restrictions
- Finalizing cabinets before major appliances are selected
- Covering unresolved unit issues without records
- Comparing quotations only by the final total
- Changing scope without documenting it
BEFORE YOUR FIRST CONSULTATION
What to Prepare Before Talking to a Renovation Contractor
You do not need a complete design brief to begin. Start with the basics.
- Your property or development name
- Your floor plan
- Photos of the current unit condition
- Your key collection status
Other useful details
- The areas you intend to renovate
- Major built-ins you need
- Important appliances you plan to use
QUICK ANSWERS
Frequently Asked Questions
What should I do first after getting keys?
First, understand the unit condition, record any visible defects, and review your management’s renovation rules before finalizing any built-ins or wet works.
Should defects be checked before renovation?
Yes. It is highly recommended to record the original condition of walls, ceilings, and tiles before your renovation covers them up.
Do I need management approval?
For strata properties like condominiums, yes. You generally need prior written approval, and rules vary by development regarding deposits, working hours, and lift usage.
When should appliances be confirmed?
Major appliances like ovens, fridges, and hobs should be confirmed before your carpentry drawings are finalized, as their exact dimensions dictate the cabinet design.
Is there one correct renovation sequence?
No. The actual sequence depends on your specific scope, whether you are doing wet works, the type of flooring, and management requirements.
What should I prepare for quotation?
A floor plan, unit photos, and a general list of areas you intend to renovate are enough to start a productive conversation.